WhatsApp Link



Bio Electrical Installations 9000L consists of one 9000 -liter digester unit , 1 unit of purification of biogas ( methane purifier ) MP 12135 ( PVC / steel ) , gas holder capacity of 7 m3 , 1 BG 5 KVA generator units ( biogas power generator 5000 watts ) , bacterial activator methane GP - 7 for 1 month and equipment installations to stoves and biogas generators .

BD Bio Electrical Installations 9000L capable of processing waste biomass or organic waste for the first time 9 m3 of slurry ( a mixture of 1 : 1 between organic material and water ) and the next day 0.45 m3 of slurry consisting of a mixture of water and organic material 0,225 tons / day .

Installation BD 9000 L will produce biogas pure > 80 % methane ( CH4 ) as much as 12-16 m3/day which has power and high calorie burning stove as an ingredient for cooking the equivalent to 8 kg of LPG , or fuel gas can ignite 1 unit 5000 watt generator as much as 15.12 KWH ( kilo watt hour ) . For customers who are concerned with the quality and productivity of biogas digester reactor mendigesti fibrous material ( garbage , biomass other than manure ) ,

special order basis (customized), can be equipped with:

 

  1. Pump rodent substrate (Chopper pumps) placed before the inlet income outside material into the reactor. Handy pump ensures the material is available in a small size and shape of the slurry,
  2. Vacuum pump mud (submersible pumps) to ensure mixing, homogeneity and discharge sludge (slurry) do not form precipitation,
  3. Heater installation (CHP) in the form of heat from the water diverter pipe radiator exhaust air from the generator and the generator and water heater water sources, as well as
  4. Kit PH meter sensor (conductivity meter) and temperature (temperature) in order to provide information on the condition of mud (slurry) is always in a state conducive to the workings of bacterial methagenesis (*)


For more information, please visit webpage

Write a review

Note: HTML is not translated!
    Bad           Good

Bio Electrical Installation BD 9000L

  • Brands Biophos_KoGas
  • Product Code: Instalasi
  • Availability: Pre-Order
  • Rp.62,950,000,-


Related Products

Biogas Power Plant PLTBM 3-31616

Biogas Power Plant PLTBM 3-31616

Biomass Power Plant ( PLTBM) 6-31616 shelter is the generation of electrical energy with 6 BD 3000 L..

Rp.139,500,000,-

Bio Electric Installation BD 3000L

Bio Electric Installation BD 3000L

Bio Electrical Installation 3000L consists of 1 unit 3000 liter digester, 1 unit biogas purification..

Rp.32,950,000,-

Bio Electric Installation BD 5000L

Bio Electric Installation BD 5000L

Bio Electrical Installations 5000L consists of one 5000-liter digester unit, 1 unit of purification ..

Rp.44,950,000,-

Bio Electric Installation Shelter BD 9-9000L

Bio Electric Installation Shelter BD 9-9000L

Biogas Fuel Filling Stations ( SPBBG) shelter 9-9000L is equipment installation to stoves and genera..

Rp.695,000,000,-

Bio Electrical Installation BD 7000L

Bio Electrical Installation BD 7000L

Installation of Bio Electric 7000L consists of a 7000-liter digester unit, 1 units of purification o..

Rp.57,950,000,-

Bio Electrical Installation Shelter BD 3-5000L

Bio Electrical Installation Shelter BD 3-5000L

Bio Electrical Installation BD 3-5000 L shelter consists of 3 unit each 5000 liter digester, 1 trash..

Rp.189,500,000,-

Tags: Installation, Bio Electric Installation BD 9000L