Simple installation and operation, low service cost with anti-explosive designed of this compressor make it running in safety. Separate electric controller equipped. It is an ideal unit for fillingyour biogas tube, vehicle at home, for outdoor and indoor use.
At the filling tube 55 liters at a maximum pressure of 200 bar ( 3000 psi) has a flow rate charging 5.5 m3 / h, charging time 2.2 hours.
Video :
Kompresor Pengisian Biogas DMC 5 - Gas Filling Compressor
- Brands Biophos_KoGas
- Product Code: Kompresor Biogas
- Availability: 1
-
Rp.59,500,000,-
Related Products
MP1HP Biogas Compressor
Compressor diaphragm ( membrane) of compressed air is done by using a moving rotating membrane, to d..
Rp.7,950,000,-
Methane Purifier MP 24150
Biogas (CH4) from the generation of digester, syn gas (Co, H2) from the gasification process can be ..
Rp.15,950,000,-
BiZgas tube 55 L (Biogas, Natural Gas CNG Holder)
Now with BiZgas tube 55 L, biogas can be compressed to a pressure of 200 bar safely. Tube is made fr..
Rp.3,950,000,-
Biogas Filling Station (SPBBG) 3-7000L
Biogas Fuel Filling Station (SPBBG) BD 3-7000L shelter consists of 3 units 7000-liter fiberglass dig..
Rp.249,295,000,-
Charging Compressor 3 DMC Biogas - Methane Gas Filling Compressor
Installation DMC 3 is pure biogas compressor charging into the pressure vessel can be operated pract..
Rp.53,500,000,-
Welder Genset Machine [ Natural Gas, CNG, Biogas] Fuels
The mechanization tool in this workshop field is fueled by biomethane RNG - a renewable natural gas ..
Rp.13,950,000,-
Biogas Digester 200 T Power Plant 600 KWh
Digster Biophos_KoGas BD 200 T as Biogas Fuel Filling Station ( SPBBG ) is an installation of biogas..
Rp.2,350,000,000,-
Methan Gas Filling Compressor
MP1HP22 compressor is a pump for charging biometan RNG (pure biogas) into a pressurized tube that ca..
Rp.23,450,000,-
Biogas Fuel Filling Stations
Biogas Fuel Filling Station ( SPBBG ) shelter 9 - 9000L is a biogas generation plant consisting of 1..
Rp.713,562,500,-
Biogas Fuel Filling Stations Shelter 5-9000 L
Biogas Fuel Filling Station ( SPBBG ) 5 - 9000L shelter is an installation of centralized biogas gen..
Rp.463,957,500,-
Biogas Balloon Reservoirs [ BPT 10 m3]
Biomethane storage balloon RNG from biogas purification (Biogas Ballon Tube = BPT) made using Poly (..
Rp.11,950,000,-
Biogas Pumps
Specifications Biogas Pump, Energy saving, Rust-proof, Light body Biogas Pump Power: ..
Rp.1,750,000,-
Mix Fuel [ Biogas, natural Gas with Diesel] Genset 5 KW
With the addition of a fuel mixer (fuel intake mixer) Genset mix of natural gas, PGN gas, CNG, LNG o..
Rp.44,950,000,-
Tags: Gas Filling Compressor, Biogas charging compressors, biogas filling pumps, pressurized tubes, pure biogas, biogas business, waste processing business opportunities, biogas-biogas filling stations, biogas fuel cars