WhatsApp Link



Installation of Bio Electric 7000L consists of a 7000-liter digester unit, 1 units of purification of biogas (methane purifier ) MP 12 135 (PVC), the gas holder capacity of 7 m3, a unit of BG 5000 W generator (genset biogas power 5000 watts), bacterial methane activators GP-7 for 1 month and installation of equipment to units of biogas stoves and generators.

Installation Bio Electric BD 7000L capable of processing waste biomass or organic waste for the first time in 7 m3 (equivalent to a weight of 2.1 tons) and 1.4 m3 next day or 0.42 tons / day.

Installation BD 7000L will produce biogas pure> 80% methane (CH4) as much as 9.5-14 m3/day who has power and high calorie burning stove as the ingredient for cooking the equivalent of 5.79 kg of LPG, or materials fuel gas can turn 5000 Watt generator units of 15.12 KWH (kilo watt hour).


special order basis (customized), can be equipped with:
 

  1. Pump rodent substrate (Chopper pumps) placed before the inlet income outside material into the reactor. Handy pump ensures the material is available in a small size and shape of the slurry,
  2. Vacuum pump mud (submersible pumps) to ensure mixing, homogeneity and discharge sludge (slurry) do not form precipitation,
  3. Heater installation (CHP) in the form of heat from the water diverter pipe radiator exhaust air from the generator and the generator and water heater water sources, as well as
  4. Kit PH meter sensor (conductivity meter) and temperature (temperature) in order to provide information on the condition of mud (slurry) is always in a state conducive to the workings of bacterial methagenesis (*)
 
 
 
For more information, please visit this products webpage.
 
This product was added to our catalog on Saturday 23 July, 2011.

Write a review

Note: HTML is not translated!
    Bad           Good

Bio Electrical Installation BD 7000L

  • Brands Biophos_KoGas
  • Product Code: Bioelektrik
  • Availability: In Stock
  • Rp.57,950,000,-


Related Products

Biogas Digester BD 7000 L

Biogas Digester BD 7000 L

Biogas Digester BD 7000L has the strength to withstand the gas pressure up to 5 kg/cm2 and has a 10 ..

Rp.24,950,000,-

Biogas Power Plant PLTBM 71215

Biogas Power Plant PLTBM 71215

Instalation mini Biomass Power Plant (PLTBM) 71215 1 unit reactor consists of 7 m3 digester, biogas ..

Rp.87,272,500,-

Biogas Power Plant PLTBM 9-71215

Biogas Power Plant PLTBM 9-71215

Biogas Power Plant (PLTBM) 9-71215 is the generation of electrical energy consists of 9 BD 7000 L re..

Rp.507,678,200,-

Bio Electric Installation BD 5000L

Bio Electric Installation BD 5000L

Bio Electrical Installations 5000L consists of one 5000-liter digester unit, 1 unit of purification ..

Rp.44,950,000,-

Bio Electric Installation Shelter BD 3-7000L

Bio Electric Installation Shelter BD 3-7000L

Bio Electrical installation 3-7000 L consist of 3 units digester 7000 liters, 1 unit MPO 850 HD chop..

Rp.182,950,000,-

Bio Electrical Installation BD 9000L

Bio Electrical Installation BD 9000L

Bio Electrical Installations 9000L consists of one 9000 -liter digester unit , 1 unit of purificatio..

Rp.62,950,000,-

Tags: Installation, Bio Electrical