Bio Electrical installation 3-7000 L consist of 3 units digester 7000 liters, 1 unit MPO 850 HD chopper engine (Electric 5 HP), 3 units biogas purification MP 24 150 (stainless steel), gas holder capacity > 10 m3, 1 units generator BG 5000 (biogas power generators 5000 watts), bacterial methane activators GP-7 for 1 month, equipment installation, stoves and generators. Biogas installation and Bio Electrical BioPhosko BD 7000L capable of treating waste biomass or organic waste for the first time in 21 m3 (equivalent to 7 tons) and 4.2 m3 next day or 1.26 tons/day. Every day, shelter installation 3-7000 L produce biogas with a purity > 80% methane (CH4) as much as 37.8 m3 that has high flame and calories as a stove for cooking, equivalent to 17, 388 kg of LPG, or can turn 5000 watt generator unit as much as 45.36 kWh (kilo watt hour). In addition to revenue from sales of fuel gas or electric energy above, shelter installation BD 7000 L produce sludge with organic liquid fertilizer quality as much as 3.78 m3/day. |
For more information, please visit this products webpage. |
This product was added to our catalog on Wednesday 17 August, 2011. |
Bio Electric Installation Shelter BD 3-7000L
- Brands Biophos_KoGas
- Product Code: Knock Down
- Availability: Pre-Order
-
Rp.182,950,000,-
Related Products
Bio Electrical Installation BD 7000L
Installation of Bio Electric 7000L consists of a 7000-liter digester unit, 1 units of purification o..
Rp.57,950,000,-
Bio Electrical Installation Shelter BD 3-3000L
Bio Electrical Installations 3-3000L shelter consists of 3 units 3000-liter digester, 1 thrasher MPO..
Rp.109,500,000,-
BD Biogas Digester 20 m3 Tank
In the Biodigester and Biogas Reactor product category, fermentation technology is offered for the g..
Rp.229,500,000,-
Tags: Bio Electric Installation, Bio Electric Installation Shelter BD 3-7000L