The PDL 1.2 KWH electric power storage series circuit consists of, among others, (1) Power Inverter 1 kw/220vac/ 50hz, (2) Battery 1 piece 100 ah 24 vdc capacity to store 1.2 KWH power, (2) Cables, plugs, fittings, stop 5 sets of 3 Watt LED lamps and contacts, (3) 6-1 . PC Electric Pot Stove
PDL 1.2 KWH electrical power storage will greatly help households outside the PLN electricity connection and difficulties with LPG (LPG) fuel, remote areas, activities in the forest and offshore (offshore) as well as travel needs (camping) as well as emergency conditions for natural disasters to still get energy to run cooking tools, electricity and lighting. By getting PDL 1.2 KWH fittings, it is capable of storing energy for cooking activities for 1 hour (continuously) or the energy needs of a family for 1 day (equivalent to 0.3 kg of LPG) along with home lighting and electronic equipment (TV, radio, laptop computer) . Electrical power can be refilled by supplying (charger) to generators with biogas fuel in a series of biomass power plants, supplied from methane fuel generators (landfill gas landfill), CBM coal fuel generators (coal bed methane), generators BBM (diesel), and PLN electricity.
In conditions where PLN access is available, PDL 1.2 KWH is still useful as a UPS (Uninterruptible Power Supply) providing power when PLN is off and multiplying the presence of electric power compared to installed. For household customers, R1 (450 Watt and 900 Watt), for example, can enjoy up to 2.1 KW of electrical power (so they can cook using a 900 watt induction stove).
Besides the benefits of increasing the installed power, the advantage with PDL 1.2 KWH is the difference in cooking costs. Cooking energy for 1 hour consumes 0.3 kg of LPG~ IDR 3,000 reduced by the cost of PDL 1.2 KWH of 1 KWH~ only IDR 1,200 or saves IDR 1,800/hour of cooking. The distribution of PDL 1.2 KWH in the community can divert consumption and reduce LPG (subsidized), reduce fuel consumption in power generators (diesel) in remote areas, islands and islands. And, the change of cooking from LPG to PDL 1.2 KWH, free from sparks so that it is safe to be placed in areas with flammable substances and without exhaust emissions or, very environmentally friendly (*)
https://youtube.com/shorts/EYZsSg2pTyU?feature=share
Related Products
[Biogas, Natural Gas, CNG] Electrical Machine BG 2500 W
This small power plant is powered by biomethane RNG - a renewable natural gas (Renewable Natural Gas..
Rp.15,500,000,-
Electricity Storage (PDL) 1 KW Inverter Grid
Facing the smart grid energy era, which is an intelligent electricity network that is able to integr..
Rp.34,950,000,-
Biogas Power Plant (PLTBM) 91215
Installing mini Biomass Power Plant ( PLTBM ) consists of 91215 1 9 m3 digester reactor units , 3 un..
Rp.92,437,500,-
Battery Charger
Battery charger is a fixture that is used for charging electric current to the Battery, both car and..
Rp.5,450,000,-
Biogas Fuel Filling Stations
Biogas Fuel Filling Station ( SPBBG ) shelter 9 - 9000L is a biogas generation plant consisting of 1..
Rp.713,562,500,-
Biogas Digester BD 68 m3
Made of esser plate construction with casting by 1 ply PL 07 LPE resin material, mat type Wr 400 (wo..
Rp.299,500,000,-
Tags: electricity distribution- biogas generator- electric power storage- electric power divider- induction cooker- CSR, -environmentally friendly energy- electric power storage battery- OFF Grid